AGILE


AGILE:
It is a SDLC methodology to develop a product in company. It uses Spiral + RAD methods in
development, divide and develop parallel. It this process has below Roles :

A. Business Analyst.(BA)
B. Developer (DEV)
C. Quality Analyst.(QA)
D. Architecture (Arch.)

1) Epic:
End client/customer provides all his requirements to BA.
BA prepares the document (known as EPIC).
Which contains functional and technical requirements.
It is like a reference book to product/project.
We need to develop only points provided in document(not more or less)
This document needs a final review by End Client and approval by Product Owner.










2)Epic Conversion: Epic will be divided into 2 parts initially. Those are
High level Design/Document
Low level Design/Document

HLDs are constructed for End User(for product understand and usage) and LLDs are done for
Programmer View.

3)Scrum Team: To develop the product Owner creates a Team with DEV,BA,QA & Arch with
MASTER and Leads

4)Story creations: A story is a part of project, It can be a module/sub module/task/sub task.
A story can be combination of modules/tasks also.
Size and limits of Stories are defined by BAs.
Each story Contains "Acceptance Criteria" ie what to implement for given story in point
by point to Dev/QA/Arch given by BA.

5)Story points Calculations: Time taken to develop a story is known as "Efforts Estimations".
These are guess values(Not exact) given by team members.
1 Story point = 8 Hours , 0.5 Story point = 4 Hours
ex: Story-8560 needs 4.5 story points total time (hours)is:36

6) Sprint Planning: "For a period of time what stories we need to implement" is decided in a
meeting. Also known as Spring Planning. A sprint is known as milestone/small release/targets.
In this meeting BA explains about story to all others. They should understand and provide
efforts for those.
A sprint can be planned for 10 days,15 days, 1 month... (based on company & project)
At a time we cannot plan for all stories. for example, in our project we have 100 stories
and we planned as below:
Sprint-1 (Story 1 to 12) for 15 days.
Sprint-2 (Story 13 to 32) for 25 days.
Unplanned stories comes under product backlogs (Story 33 to 100).
In Sprint-1 we planned for 12 Stories, but only 10 are finished after 15 days then, 2 will

be moved to Product backlogs.














7)Sprint Evaluation: From Day-1 coding/implementation is started by developer. To
implement any story dev has to code and Test from his side. To represent work status of a
story, we follow Story life cycle. Shown as below, (possible values are: Open->In Progress-

>Resolved ->Closed or Re-Open)














Open: Every developer gets story in Open Status, which indicates ready to start (ready
for coding)
In-Progress: Which indicates story is under implementation ( coding is started)
Resolved: Indicates Coding and Unit Testing is done. Code is available in Repository (ex:
GIT).
Closed: Once Testing done by QA and working fine, then story status will be Closed.
Re-Open: If code contains Bugs, then story is not complete which will be converted to
Re-Open and QA creates a BUG with below priority levels.

BUG : It indicates problem in application. Every bug has a level in AGILE process, those are given below with meaning and symbols.

I. Blocker: Unable to do any process.
II. Critical: High level problem (But not stopping complete process)
III. Major: Normal/Medium problem (Stopping in one way/ other possible processing
ways are available)
IV. Minor: Small problem or occurs very rare.
V. Trivial: Ignorable problem. not makes any problem in process.












8)Bug/Defect Life cycle: While developing a story, it may contain problems (bug) or it is
incomplete then QA identifies the bug and reports to Developer. ex: Bug-32( Critical): Email is
not sending while vendor registration. Attached to Story-54(Vendor Registration). Developer
checks bug and validates , if valid starts fixing else reject the bug.

















9)Burn Down Chart: This is a global chart, constructed to represent status of the
sprint/Sprints. Up-to-date what % of work done is shown by this chart. If one story is finished,
then it shows -value ex: -3.25 points. At end all stories should be finished. +ve value indicates
Work is re-opened.














10)Scrum Meetings: On Starting Sprint, every day we need to provide status updates to
Scrum Master. For this every day meeting is taken by master mostly 15-20 minutes. ex: 10:45
to 11:00 AM. sometimes 3:00 to 3:25 PM. In this meeting we need to tell "what we did yester
day, what we will do today and tomorrow".