AGILE:
It is a SDLC methodology
to develop a product in company. It uses Spiral + RAD methods in
development, divide and
develop parallel. It this process has below Roles :
A. Business Analyst.(BA)
B. Developer (DEV)
C. Quality Analyst.(QA)
D. Architecture (Arch.)
1) Epic:
End client/customer
provides all his requirements to BA.
BA prepares the document
(known as EPIC).
Which contains
functional and technical requirements.
It is like a reference
book to product/project.
We need to develop only
points provided in document(not more or less)
This document needs a
final review by End Client and approval by Product Owner.
2)Epic Conversion: Epic will be divided into 2 parts initially.
Those are
High level
Design/Document
Low level
Design/Document
HLDs are constructed for
End User(for product understand and usage) and LLDs are done for
Programmer View.
3)Scrum Team: To develop the product Owner creates a Team with DEV,BA,QA &
Arch with
MASTER and Leads
4)Story creations: A story is a part of project, It can be a module/sub
module/task/sub task.
A story can be combination
of modules/tasks also.
Size and limits of Stories
are defined by BAs.
Each story Contains
"Acceptance Criteria" ie what to implement for given story in point
by point to Dev/QA/Arch
given by BA.
5)Story points
Calculations: Time taken to develop a
story is known as "Efforts Estimations".
These are guess values(Not
exact) given by team members.
1 Story point = 8 Hours ,
0.5 Story point = 4 Hours
ex: Story-8560 needs 4.5
story points total time (hours)is:36
6) Sprint Planning: "For a period of time what stories we need to
implement" is decided in a
meeting. Also known as
Spring Planning. A sprint is known as milestone/small release/targets.
In this meeting BA explains
about story to all others. They should understand and provide
efforts for those.
A sprint can be planned for
10 days,15 days, 1 month... (based on company & project)
At a time we cannot plan
for all stories. for example, in our project we have 100 stories
and we planned as below:
Sprint-1 (Story 1 to 12)
for 15 days.
Sprint-2 (Story 13 to 32)
for 25 days.
Unplanned stories comes
under product backlogs (Story 33 to 100).
In Sprint-1 we planned for
12 Stories, but only 10 are finished after 15 days then, 2 will
be moved to Product
backlogs.
7)Sprint Evaluation: From Day-1 coding/implementation is started
by developer. To
implement any story dev
has to code and Test from his side. To represent work status of a
story, we follow Story
life cycle. Shown as below, (possible values are: Open->In Progress-
>Resolved ->Closed
or Re-Open)
Open: Every developer gets
story in Open Status, which indicates ready to start (ready
for coding)
In-Progress: Which
indicates story is under implementation ( coding is started)
Resolved: Indicates Coding
and Unit Testing is done. Code is available in Repository (ex:
GIT).
Closed: Once Testing done
by QA and working fine, then story status will be Closed.
Re-Open: If code contains
Bugs, then story is not complete which will be converted to
Re-Open and QA creates a
BUG with below priority levels.
BUG : It indicates problem
in application. Every bug has a level in AGILE process, those are given below
with meaning and symbols.
I. Blocker: Unable to do any process.
II. Critical: High level
problem (But not stopping complete process)
III. Major: Normal/Medium
problem (Stopping in one way/ other possible processing
ways are available)
IV. Minor: Small problem
or occurs very rare.
V. Trivial: Ignorable
problem. not makes any problem in process.
8)Bug/Defect Life cycle: While developing a story, it may contain
problems (bug) or it is
incomplete then QA
identifies the bug and reports to Developer. ex: Bug-32( Critical): Email is
not sending while vendor
registration. Attached to Story-54(Vendor Registration). Developer
checks bug and validates
, if valid starts fixing else reject the bug.
9)Burn Down Chart: This is a global chart, constructed to
represent status of the
sprint/Sprints.
Up-to-date what % of work done is shown by this chart. If one story is finished,
then it shows -value ex:
-3.25 points. At end all stories should be finished. +ve value indicates
Work is re-opened.
10)Scrum Meetings: On Starting Sprint, every day we need to
provide status updates to
Scrum Master. For this
every day meeting is taken by master mostly 15-20 minutes. ex: 10:45
to 11:00 AM. sometimes
3:00 to 3:25 PM. In this meeting we need to tell "what we did yester
day, what we will do
today and tomorrow".